Note: Click on the linked heading text to expand or collapse.
The office of the Executive Engineer, APWD.
30 days from the date of submission of filled in Requisite form.
The applicant has to complete all the internal water supply lines with fittings and fixtures and a 15mm dia GI Pipe line has to be laid up to the point where main water supply distribution lines of APWD is available.
No such period specified till date.
Executive Engineer, APWD of the concerned area.
S.No | Designation | Phone Number | jurisdiction |
1 | Executive Engineer | 03192- 252669 | Entire Calicut , Beodnabad, Sippighat, Chouldhari, Wandoor, Guptapara,Humfrygunj. |